Edit (1/11/23):The dates have been changed via addenda. Addenda can be downloaded at www.guamtransportationprogram.com.
This ad can be downloaded at www.guamtransportationprogram.com
Traffic Signal System Upgrade, Islandwide Phase 1
GU-THS-1000(116)
Project Description
The project includes upgrading of eight (8) traffic signal systems. Four (4) typical box type cable span wire systems (Route 1/Route 6, Route 1/Route 4, Route 4/Route 15, Route 4/ Route 10); one (1) mast-arm signal system (Route 1/Aspinal Ave.); and one (1) diagonal type cable span wire system (Route 1/5th Street). Project also includes replacement of traffic loops at Route 4/Chalan Canton Tutujan intersection, and at Route 1/Route 14A intersection. and installation of GPS clocks at various locations.
This ad can be downloaded at www.guamtransportationprogram.com
Traffic Signal System Upgrade, Islandwide Phase 1
GU-THS-1000(116)
Project Description
The project includes upgrading of eight (8) traffic signal systems. Four (4) typical box type cable span wire systems (Route 1/Route 6, Route 1/Route 4, Route 4/Route 15, Route 4/ Route 10); one (1) mast-arm signal system (Route 1/Aspinal Ave.); and one (1) diagonal type cable span wire system (Route 1/5th Street). Project also includes replacement of traffic loops at Route 4/Chalan Canton Tutujan intersection, and at Route 1/Route 14A intersection. and installation of GPS clocks at various locations.
ISSUE DATE | PRE-BID CONFERENCE | ANTICIPATED BID OPENING | ANTICIPATED LETTER OF INTENT TO AWARD | ANTICIPATED NOTICE TO PROCEED | CONTRACT TIME |
---|---|---|---|---|---|
2O-SEPT-22 | 27-SEPT-22 | 1-DEC-22 | 19-JAN-23 | 22-JUN-23 | 240 CALENDAR DAYS |
GUAM TRANSPORTATION PROGRAM
Telephone: (671) 646-3452
Fax: (671) 646-3449
Website: www.guamtransportationprogram.com