Traffic Advisory for the Week of June 24-30, 2024

Traffic Advisory for the Week of June 24-30, 2024

ANNOUNCEMENT

Road Safety Reminder for the Week

Backing Out/Parking

Before you back out of a driveway or parking spot, prevent backovers by walking around your vehicle to check for children running and playing.

When using a backup camera, remember that kids, pets, and objects may be out of view but still in the path of your vehicle. When children play, they are often oblivious to cars and trucks around them. They may believe that drivers will watch out for them.

Furthermore, every vehicle has a blind zone. As the size and height of a vehicle increases, so does the “blind zone” area. Large vehicles, trucks, SUVs, RVs, and vans are more likely than cars to be involved in backovers.
 

According to Guam’s Traffic Violation Bureau’s (TVB) Traffic Fine Schedule

GCA (Guam Code Annotated) Code Description Eff. 01/01/14
3323 Unsafe Starting or Backing $80.00



Guam Construction Update

Motorists are advised to drive cautiously through the construction zones, observe all posted speed limit and construction signs, and carefully heed flaggers (when present). Alternate routes and/or adjusting drive times when feasible are encouraged.
 
Route 14B (Ypao Road) Reconstruction and Widening (Route 14 to Carmen Memorial Dr.), Phase 1 Cliffside – Tamuning
From Monday, 6/24/24 to Saturday, 6/29/24 between 9:00 AM and 4:00 PM, motorists are advised that the contractor will continue shoulder work along Route 14B and on the sidewalk. During this time, expect minimal lane shifts and intermittent lane closures.
 
Route 14 Resurfacing from Route 1 to Route 14B – Tamuning
From Monday, 6/24/24 to Saturday, 6/29/24 between 9:00 AM and 4:00 PM, motorists are advised that the contractor will continue shoulder work along Route 14 (Chalan San Antonio). During this time, expect minimal lane shifts and intermittent lane closures.
 
Route 10 Pavement Repairs – Barrigada
From Monday, 6/24/24 to Saturday, 6/29/24 between 9:00 AM and 4:00 PM, motorists are advised that the contractor will continue pavement repairs along Route 10 starting from Leyang Road to the Route 8/10/16 Tri-Intersection. There will be intermittent lane closures along both sides of traffic.
 
Islandwide Grass Cutting Maintenance Project
The DPW contractor will be grass cutting at the following locations, weather permitting:
  • Monday, 6/24/24: Route 6 & Route 7
  • Monday, 6/24/24 – Saturday, 6/29/24: Route 1 Hagåtña – AAFB
  • Saturday, 6/29/24 – Sunday, 6/30/24: Route 17
Work will occur between 7:30 AM and 5:00 PM. There will be intermittent lane closures. The DPW asks motorists to please proceed with caution and remain alert for traffic control signs and work crews.
 
Route 3/Route 9 Roadside Maintenance – Dededo/Yigo
The DPW HMC crew will be performing roadside maintenance along Route 3 and Route 9. Work will occur between 7:00 AM and 3:30 PM. The DPW asks motorists to please proceed with caution and remain alert for traffic control signs and work crews.
 
Mai Mai Road Roadside Maintenance – Chalan Pago
The DPW HMC crew will be performing roadside maintenance along portions of Mai Mai Road. Work will occur between 7:00 AM and 3:30 PM. The DPW asks motorists to please proceed with caution and remain alert for traffic control signs and work crews.
 
Route 1 Roadside Maintenance – Hagåtña to Adelup
The DPW HMC crew will be performing roadside maintenance and tree trimming along Route 1 from the Route 4 Intersection (Chief Kepuha Park) to Adelup in preparation for the Liberation Day Parade. Work will occur between 7:00 AM and 3:30 PM. The DPW asks motorists to please proceed with caution and remain alert for traffic control signs and work crews.
 



 
GUAM TRANSPORTATION PROGRAM
Telephone: (671) 646-3452
Fax: (671) 646-3449

 
Notice Image
 


Share the Government of Guam’s PUBLIC NOTICES PORTAL


Share through Whatsapp, Facebook, Email and more…