Updates for Route 5 Reconstruction and Widening (Santa Rita), Route 14B Reconstruction and Widening (Ypao Road, Tamuning), Route 14 Resurfacing (Chalan San Antonio, Tamuning), Route 1 Striping from Cabras to Naval Station, Canada-Toto Loop Road Pavement Resurfacing (Barrigada), Bibic Street Pavement Resurfacing (Leyang, Barrigada), Maria Candelaria Street (Asan-Maina), Route 1 Roadside Maintenance (Dededo-Yigo), and Ukudu Pipeline Installation