Traffic Advisory for July 15-21, 2024

Traffic Advisory for July 15-21, 2024

ANNOUNCEMENT

Road Safety Reminder for the Week

Dealing with Speeding and Aggressive Drivers

Speeding behavior and aggressive drivers may not only affect the speeder—it can also affect other drivers, pedestrians, and bicyclists. Here are some tips for encountering speeders on the road:

  • If you are in the left lane and someone wants to pass, move over and let them by.
  • Give speeding drivers plenty of space. Speeding drivers may lose control of their vehicle more easily.
  • Adjust your driving accordingly. Speeding is tied to aggressive driving. If a speeding driver is tailgating you or trying to engage you in risky driving, use judgment to safely steer your vehicle out of the way.
  • Call the police if you believe a driver is following you or harassing you.

According to Guam’s Traffic Violation Bureau’s (TVB) Traffic Fine Schedule

GCA (Guam Code Annotated) Code Description Eff. 01/01/14
3301A Imprudent Driving $70.00
3301B Fail to Stop Within Assured Clear Distance $400.00
3301C Maximum Speed Limit (45 mph) $80.00
3301F Speeding (per mph over the speed limit) $8.00



Guam Construction Update

Motorists are advised to drive cautiously through the construction zones, observe all posted speed limit and construction signs, and carefully heed flaggers (when present). Alternate routes and/or adjusting drive times when feasible are encouraged.
 
Route 14B (Ypao Road) Reconstruction and Widening (Route 14 to Carmen Memorial Dr.), Phase 1 Cliffside – Tamuning
From Monday, 7/15/24 to Saturday, 7/20/24 between 9:00 AM and 4:00 PM, motorists are advised that the contractor will continue shoulder work along Route 14B and on the sidewalk. During this time, expect minimal lane shifts and intermittent lane closures.
 
Route 14 Resurfacing from Route 1 to Route 14B – Tamuning
From Monday, 7/15/24 to Saturday, 7/20/24 between 9:00 AM and 4:00 PM, motorists are advised that the contractor will continue shoulder work along Route 14B and on the sidewalk. During this time, expect minimal lane shifts and intermittent lane closures.
 
Islandwide Grass Cutting Maintenance Project
The DPW contractor will be grass cutting at the following locations, weather permitting:
  • Monday, 7/15/24 – Tuesday, 7/16/24: Route 1 from Hagatna – AAFB
  • Wednesday, 7/17/24 – Thursday, 7/18/24: Route 17
  • Friday, 7/19/24 – Saturday, 7/20/24: Route 16 – Route 8
Work will occur between 7:30 AM and 5:00 PM. There will be intermittent lane closures. The DPW asks motorists to please proceed with caution and remain alert for traffic control signs and work crews.
 
Islandwide Village Streets Paving – Chalan Koda, Dededo/Yigo
The DPW HMC Crew will continue preparing portions of Chalan Koda for paving. Work will occur between 7:00 AM and 3:30 PM. The DPW asks motorists to please proceed with caution and remain alert for traffic control signs and work crews.
 



 
GUAM TRANSPORTATION PROGRAM
Telephone: (671) 646-3452
Fax: (671) 646-3449

 
Notice Image
 


Share the Government of Guam’s PUBLIC NOTICES PORTAL


Share through Whatsapp, Facebook, Email and more…