Road Safety Reminder for the Week
School Buses
The Motor Vehicle Code of Guam expressly requires that traffic in all directions must come to a complete stop when approaching a school bus that is stopped for the purpose of taking on or discharging students, WHETHER OR NOT ANY STUDENTS ARE CROSSING THE ROAD. School buses must display their red, four-way flashing signal lights as well as the Stop-arm located on the driver’s side of the vehicle. Even on multi-lane highways when the bus is on the other side of the road, you must stop until the Stop-arm is retracted and the bus resumes motion unless the bus driver signals you to proceed.
According to Guam’s Traffic Violation Bureau’s (TVB) Traffic Fine Schedule
GCA (Guam Code Annotated) Code | Description | Eff. 01/01/14 |
---|---|---|
3201E | Red Flashing Light (School Bus) Required | $40.00 |
3336A | Overtaking Vehicle Stop for Loading/Unloading Pass | $100.00 |
3336C | Passing School Bus | $300.00 |
Guam Construction Update
Motorists are advised to drive cautiously through the construction zones, observe all posted speed limit and construction signs, and carefully heed flaggers (when present). Alternate routes and/or adjusting drive times when feasible are encouraged.
From Monday, 9/2/24 to Friday, 9/6/24 between 9:00 AM and 4:00 PM, motorists are advised that the contractor will continue shoulder work along Route 14B and on the sidewalk. During this time, expect minimal lane shifts and intermittent lane closures.
From Saturday, 9/7/24 to Sunday, 9/8/24 there will be a full road closure of Route 14B (Ypao Road) from Congressman Palting Loop to Pale San Vitores from 7:00 am to 5:00 pm. The contractor will be installing new streetlights in this area. Motorists should use alternate routes during this time.
From Monday, 9/2/24 to Saturday, 9/7/24 between 9:00 AM and 4:00 PM, motorists are advised that the contractor will continue shoulder work along Route 14 (Chalan San Antonio). During this time, expect minimal lane shifts and intermittent lane closures.
The DPW HMC crew will continue preparing streets in Agat village for paving starting on Jose Herrera Street working towards North Santa Cruz Street and San Antonio de Padua Street. Work will occur between 7:30 AM and 3:30 PM. The DPW asks motorists and residents to please proceed with caution and remain alert for traffic control signs and work crews.