Road Safety Reminder for the Week
Know What Is at Your Side
Any time you come to a place where people may cross or enter your path or a line of traffic meets another, you should look to the left and right sides of your vehicle to make sure no one is coming. Always look to each side of your vehicle at intersections and crosswalks.
At intersections:
-
Look both ways even if other traffic has a red traffic signal light or a stop sign
- Look to the left first, since vehicles coming from the left are closer to you than vehicles coming from the right.
- Look to the right.
- Take one more look to the left in case there is a pedestrian, bicyclist, or vehicle you did not see the first time.
- Do not rely on traffic signal lights. Some drivers do not obey traffic signal lights. Before you enter an intersection, look left, right, and ahead for approaching traffic
According to Guam’s Traffic Violation Bureau’s (TVB) Traffic Fine Schedule
GCA (Guam Code Annotated) Code | Description | Eff. 01/01/14 |
---|---|---|
3325 | Failure to Yield at Intersection | $100.00 |
3329 | Fail to Yield to Pedestrian (Intersection) | $200.00 |
3339G | Failure to Yield Right-of-Way | $80.00 |
Guam Construction Update
Motorists are advised to drive cautiously through the construction zones, observe all posted speed limit and construction signs, and carefully heed flaggers (when present). Alternate routes and/or adjusting drive times when feasible are encouraged.
From Monday, 2/17/25 to Friday, 2/21/25 between 9:00 AM and 4:00 PM, motorists are advised that the contractor will continue shoulder work along Route 14B and on the sidewalk. During this time, expect minimal lane shifts and intermittent lane closures.
The DPW contractor will be paving San Antonio De Padua St in Agat Village. Work will occur between 7:00 AM and 4:00 PM. The DPW asks motorists and residents to proceed with caution and remain alert for traffic control signs and work crews.
The DPW contractor will be paving Kongga Road at the intersection with Cepeda Way. Work will occur between 7:00 AM and 4:00 PM. The DPW asks motorists and residents to proceed with caution and remain alert for traffic control signs and work crews.
The DPW contractor will be paving Pale Kieran Hickey Dr in Sinajana. Work will occur between 7:00 AM and 4:00 PM. The DPW asks motorists and residents to proceed with caution and re-main alert for traffic control signs and work crews.
The DPW HMC crew will be striping the southbound, uphill lane of Route 14A (JFK Hill). Work will occur between 8:00 AM and 3:00 PM, weather permitting. The DPW asks motorists to proceed with caution and remain alert for traffic control signs and work crews.
The DPW HMC crew will continue grass cutting along Route 15. Work will occur between 8:00 AM and 3:00 PM. The DPW asks motorists and residents to proceed with caution and remain alert for traffic control signs and work crews.
