Road Safety Reminder for the Week
Pedestrian Safety
8 Safety Tips for Drivers:
- Look out for pedestrians everywhere, at all times.
- Use extra caution when driving in hard-to-see conditions, such as nighttime or bad weather.
- Slow down and be prepared to stop when turning or otherwise entering a crosswalk.
- Yield to pedestrians in crosswalks and stop well back from the crosswalk to give other vehicles an opportunity to see the crossing pedestrians so they can stop too.
- Never pass vehicles stopped at a crosswalk. There may be people crossing where you can't see.
- Never drive under the influence of alcohol and/or drugs.
- Follow the speed limit, especially around people on the street, in school zones and in neighborhoods where children are present.
- Be extra cautious when backing up and look for pedestrians.
According to Guam’s Traffic Violation Bureau’s (TVB) Traffic Fine Schedule
GCA (Guam Code Annotated) Code | Description | Eff. 01/01/14 |
---|---|---|
3328 | Failure to Yield to Pedestrian | $200.00 |
3329 | Failure to Yield to Pedestrian (Intersection) | $200.00 |
3301A | Imprudent Driving | $80.00 |
3301F | Speeding (per mph over the speed limit) | $8.00 |
3323 | Unsafe Starting or Backing | $80.00 |
Guam Construction Update
Motorists are advised to drive cautiously through the construction zones, observe all posted speed limit and construction signs, and carefully heed flaggers (when present). Alternate routes and/or adjusting drive times when feasible are encouraged.
Islandwide Safety Improvements on Primary Roads (Striping and Marking)
TO-1: Route 1 from Route 1/Route 6 to Route 1/Route 11 Intersections
General construction activities will continue next week for the Route 1 Striping and Marking Project along Route 1, between the Route 1/Route 6 and Route 1/Route 11 intersections project. These activities will involve lane shifts and lane closures.
From Monday 3/24/25 through Friday 3/28/25 from 9:00 AM to 4:00 PM, the contractor will work on pavement striping and markings, from Kalackac Road (after Fish Eye Marine Park) to Joaquin LG Jesus St. (Asan River). There will be multiple intermittent closures on northbound and southbound lanes.
No construction activities are scheduled from Saturday to Sunday, 3/29/25 – 3/30/25.
Motorists are advised to exercise caution and follow the directions of flaggers when present. Alternate routes and/or adjusting drive times when feasible are encouraged.
TO-1: Route 1 from Route 1/Route 6 to Route 1/Route 11 Intersections
General construction activities will continue next week for the Route 1 Striping and Marking Project along Route 1, between the Route 1/Route 6 and Route 1/Route 11 intersections project. These activities will involve lane shifts and lane closures.
From Monday 3/24/25 through Friday 3/28/25 from 9:00 AM to 4:00 PM, the contractor will work on pavement striping and markings, from Kalackac Road (after Fish Eye Marine Park) to Joaquin LG Jesus St. (Asan River). There will be multiple intermittent closures on northbound and southbound lanes.
No construction activities are scheduled from Saturday to Sunday, 3/29/25 – 3/30/25.
Motorists are advised to exercise caution and follow the directions of flaggers when present. Alternate routes and/or adjusting drive times when feasible are encouraged.
Islandwide Primary Roads Paving & Pavement Markings
TO-3: Route 14A Pavement Repairs – Tamuning/Tumon
On Saturday, March 29, 2025, from 9:00 AM to 4:00 PM, road construction for pavement repairs will begin along Route 14A in Tamuning. Motorists should expect intermittent lane closures in both directions and are advised to drive with caution and plan for potential delays.
Motorists are advised to take alternate routes such as Route 14B (Ypao Road) or Pale San Vitores Road by Bayview Hotel if travelling to and from Marine Corps Drive and Tumon.
No construction activities are scheduled from Monday to Friday, March 24–28, 2025, and on Sunday, March 30, 2025.
TO-3: Route 14A Pavement Repairs – Tamuning/Tumon
On Saturday, March 29, 2025, from 9:00 AM to 4:00 PM, road construction for pavement repairs will begin along Route 14A in Tamuning. Motorists should expect intermittent lane closures in both directions and are advised to drive with caution and plan for potential delays.
Motorists are advised to take alternate routes such as Route 14B (Ypao Road) or Pale San Vitores Road by Bayview Hotel if travelling to and from Marine Corps Drive and Tumon.
No construction activities are scheduled from Monday to Friday, March 24–28, 2025, and on Sunday, March 30, 2025.

GUAM TRANSPORTATION PROGRAM
Telephone: (671) 646-3452
Fax: (671) 646-3449
Website: www.guamtransportationprogram.com