Traffic Advisory for the Week of June 30 - July 6, 2025

Traffic Advisory for the Week of June 30 - July 6, 2025

ANNOUNCEMENT

Road Safety Reminder for the Week

Road Conditions - Heavy Rain
During heavier rains, it’s advisable to turn on your headlights for increased visibility. Scan ahead for large puddles and slow down when you go through the water. Most vehicles lack protection on the underside and large quantities of water splashed up in the undercarriage can soak wiring, brake linings and other essential parts. Failure to negotiate large puddles with caution can result in a stall or in a brake failure of malfunction.

Keep your car under control and your brakes in excellent condition. Always allow a safe distance between your car and any other car or person, so that you make a smooth stop. Jerky stops of-ten cause dangerous skidding.

In the event you do find yourself skidding, DON’T SLAM on your brakes. Instead, take your foot off the accelerator and gently turn your wheels in the direction of the skid. Braking or oversteer-ing to correct may end up in another skid and locked brakes. Once the car straightens up, gently brake to a stop.

 

According to Guam’s Traffic Violation Bureau’s (TVB) Traffic Fine Schedule

GCA (Guam Code Annotated) Code Description Eff. 01/01/14
3205G Brakes Required – Maintained in Good Working Condition $80.00
3301A Imprudent Driving $70.00
3301B Fail to Stop Within Assured Clear Distance $400.00



Guam Construction Update

Motorists are advised to drive cautiously through the construction zones, observe all posted speed limit and construction signs, and carefully heed flaggers (when present). Alternate routes and/or adjusting drive times when feasible are encouraged.
 
Islandwide Safety Improvements on Primary Roads (Striping and Markings) TO-2
Route 1 from Route 6 (Adelup) to Alupang Towers – Hagåtña

Pavement striping and marking activities will commence along Route 1, from the Route 6 intersection to the Mobil Anigua Station, starting Monday, 3/30/2025, through Thursday, 7/3/2025. Intermittent lane closures in both directions are expected during work hours. Motorists are advised to plan accordingly and proceed with caution.

No construction activities are scheduled for Friday, July 4, and Sunday, July 6, 2025.
 
Islandwide Primary Roads Paving & Pavement Markings TO-3:
Route 8 Pavement Repairs – Barrigada

Paving repairs along Route 8 in Barrigada are scheduled from Monday, 6/30/2025 to Thursday, 7/3/2025, and on Saturday, 7/5/2025. Work hours will be from 9:00 AM to 4:00 PM on weekdays, and from 7:00 AM to 4:00 PM on the weekend. Construction will occur between Route 8/7A intersection and StayWell Insurance, through E.T. Calvo Way. Intermittent lane closures are expected in both directions during work hours. Motorists are advised to plan accordingly and drive with caution.

No construction activities are scheduled for Friday, July 4, and Sunday, July 6, 2025.
 
Route 3 Roadside Maintenance – Dededo
From Monday, 6/30/25 – Thursday, 7/3/25 and on Saturday, 7/5/25 from 9:00 AM to 3:00 PM, motorists are advised that the DPW-HMC crew will continue bush cutting the northbound side of Route 3 in Dededo. The DPW asks motorists to please proceed with caution and remain alert for traffic control signs and work crews.
 
Route 2 Roadside Maintenance – Agat
From Monday, 6/30/25 – Thursday, 7/3/25 and on Saturday, 7/5/25 from 9:00 AM to 3:00 PM, motorists are advised that the DPW-HMC crew will be side cutting along Route 2 in Agat. The DPW asks motorists to please proceed with caution and remain alert for traffic control signs and work crews.
 



 
GUAM TRANSPORTATION PROGRAM
Telephone: (671) 646-3452
Fax: (671) 646-3449

 
Notice Image
 


Share the Government of Guam’s PUBLIC NOTICES PORTAL


Share through Whatsapp, Facebook, Email and more…