Road Safety Reminder for the Week
Sun Glare
To help manage sun glare:
- Keep the inside and outside of your windshield clean.
- Wear polarized sunglasses.
- Maintain enough space between your vehicle and the vehicles around you.
- Make sure your car visor works and is free of anything that would restrict use.
- Be aware of pedestrians. You may have difficulty seeing them.
- Try to avoid driving during sunrise and sunset.
According to Guam’s Traffic Violation Bureau’s (TVB) Traffic Fine Schedule
| GCA (Guam Code Annotated) Code | Description | Eff. 01/01/14 |
|---|---|---|
| 3209A | Windshield - Non-Transparent Material Restrictions | $40.00 |
| 3209B | Windshield Wipers Required (None or Defective) | $40.00 |
| 3320 | Following Too Close (Tailgating) | $80.00 |
| 3328 | Failure to Yield to Pedestrian | $200.00 |
Guam Construction Update
Motorists are advised to drive cautiously through the construction zones, observe all posted speed limit and construction signs, and carefully heed flaggers (when present). Alternate routes and/or adjusting drive times when feasible are encouraged.
Islandwide Primary Roads Paving and Pavement Markings TO-4
Route 10 – Chalan Pago-Ordot/Mangilao/Barrigada
Construction activities will continue along Route 10 from March 23, 2026 to March 29, 2026. Contractor crews will be working at various locations along Route 10 throughout the week. Intermittent lane closures in both directions are expected during work hours:
Route 10 – Chalan Pago-Ordot/Mangilao/Barrigada
Construction activities will continue along Route 10 from March 23, 2026 to March 29, 2026. Contractor crews will be working at various locations along Route 10 throughout the week. Intermittent lane closures in both directions are expected during work hours:
- Monday, March 23, 2026, 9:00 AM – 4:00 PM, (Route 15 corner Spanish St. for valve box adjustment)
- Monday–Friday, March 24–27, 2026, 9:00 AM – 4:00 PM, (Route 10/Route 4 intersection for pavement repair) - Tentative
- Saturday, March 28, 2026, 7:00 AM – 6:00 PM (Route 15/Route 10 intersection for milling and paving) - Tentative
- Sunday, March 29, 2026, No Work Scheduled. Work may be performed 7:00 AM – 6:00 PM if needed
Motorists are advised to expect traffic delays and plan their travel time accordingly. Please slow down and comply with posted speed limits when traveling through the work zone. Remain alert for uneven pavement surfaces and temporary steel plates, and drive safely at all times.
Route 4 Replacement of Ylig Bridge (Phase 2) – Ylig Memorial
General construction activities will continue for the Ylig Memorial Project. These activities will not affect the flow of traffic.
The contractor, Korando Corporation, will be working from 7:00 AM till 4:00 PM on weekdays only. No construction activities are scheduled for Saturdays and Sundays.
General construction activities will continue for the Ylig Memorial Project. These activities will not affect the flow of traffic.
The contractor, Korando Corporation, will be working from 7:00 AM till 4:00 PM on weekdays only. No construction activities are scheduled for Saturdays and Sundays.
Primary Roads Pavement Pothole Repair for Route 17, Yona
Samsung E&C America's contractor will continue repairs along Route 17, Cross Island Road from the Route 17/Route 4A intersection to the Yona Solar Project Site. Work will occur between 7:00 AM and 3:30 PM Monday - Friday. There will be intermittent lane closures in both directions during work hours.
Samsung E&C America's contractor will continue repairs along Route 17, Cross Island Road from the Route 17/Route 4A intersection to the Yona Solar Project Site. Work will occur between 7:00 AM and 3:30 PM Monday - Friday. There will be intermittent lane closures in both directions during work hours.
DPW HMC Grass Cutting
The DPW HMC crew will be grass cutting at the following locations, weather permitting:
The DPW HMC crew will be grass cutting at the following locations, weather permitting:
- Bush cutting Route 4 starting at Pago Bay, heading towards Sinajana
- Bush cutting Route 1 from Chief Kepuha Park to Adelup
Work will occur between 9:00 AM and 3:00 PM Monday - Friday.
Islandwide Grass Cutting Maintenance Project
The DPW contractor will be grass cutting at the following locations, weather permitting:
The DPW contractor will be grass cutting at the following locations, weather permitting:
- Monday, 3/23/26 – Thursday, 3/26/26: Route 1, Marine Corps Drive
- Thursday, 3/26/26 – Friday, 3/27/26: Route 15 (Yigo/Mangilao)
Work will occur between 9:00 AM and 3:00 PM. The DPW asks motorists to please proceed with caution and remain alert for traffic control signs and work crews.
GUAM TRANSPORTATION PROGRAM
Telephone: (671) 646-3452
Fax: (671) 646-3449
Website: www.guamtransportationprogram.com