Road Safety Reminder for the Week
Dealing with Speeding and Aggressive Drivers
Speeding behavior and aggressive drivers may not only affect the speeder—it can also affect other drivers, pedestrians, and bicyclists. Here are some tips for encountering speeders on the road:
- If you are in the left lane and someone wants to pass, move over and let them by.
- Give speeding drivers plenty of space. Speeding drivers may lose control of their vehicle more easily.
- Adjust your driving accordingly. Speeding is tied to aggressive driving. If a speeding driver is tailgating you or trying to engage you in risky driving, use judgment to safely steer your vehicle out of the way.
- Call the police if you believe a driver is following you or harassing you.
According to Guam’s Traffic Violation Bureau’s (TVB) Traffic Fine Schedule
| GCA (Guam Code Annotated) Code | Description | Eff. 01/01/14 |
|---|---|---|
| 3301A | Imprudent Driving | $70.00 |
| 3301B | Fail to Stop Within Assured Clear Distance | $400.00 |
| 3301C | Maximum Speed Limit (45 mph) | $80.00 |
| 3301F | Speeding (per mph over the speed limit) | $8.00 |
Guam Construction Update
Motorists are advised to drive cautiously through the construction zones, observe all posted speed limit and construction signs, and carefully heed flaggers (when present). Alternate routes and/or adjusting drive times when feasible are encouraged.
Islandwide Primary Roads Paving and Pavement Markings TO-4
Route 10 – Chalan Pago-Ordot/Mangilao/Barrigada
Construction activities will continue along Route 10 from May 11, 2026 to May 17, 2026. Contractor crews will be working at various locations along Route 10 throughout the week. Intermittent lane closures in both directions are expected during work hours:
Monday, May 11 2026, 9:00 AM – 4:00 PM
Route 10 – Chalan Pago-Ordot/Mangilao/Barrigada
Construction activities will continue along Route 10 from May 11, 2026 to May 17, 2026. Contractor crews will be working at various locations along Route 10 throughout the week. Intermittent lane closures in both directions are expected during work hours:
Monday, May 11 2026, 9:00 AM – 4:00 PM
- Pavement repair (Full Depth) at Route 4/Route 10 intersection
Tuesday–Friday, May 12-15, 2026, No work scheduled. Work may be performed 7:00 AM - 6:00 PM if needed.
Saturday, May 16, 2026, 7:00 AM – 6:00 PM
- Pavement repair (Milling and paving) at Route 32/Route 10 Intersection.
Sunday, May 17, 2026, No Work Scheduled. Work may be performed 7:00 AM – 6:00 PM if needed
Motorists are advised to expect traffic delays and plan their travel time accordingly. Please use alternate routes and follow posted detour signs. Reduce speed and comply with posted limits when passing through the work zone. Remain alert for uneven pavement surfaces and temporary steel plates, and proceed with caution at all times.
Islandwide Safety Improvement on Primary Roads (Striping and Marking)
TO-03 - Route 1, from Route 27 to AAFB
Construction activities will begin along Route 1, between Wusstig Road and Juan Jacinto Road from May 11, 2026 to May 15, 2026. Contractor crews will be working at various locations along this area of Route 1 throughout the week and intermittent lane closures are expected during work hours:
TO-03 - Route 1, from Route 27 to AAFB
Construction activities will begin along Route 1, between Wusstig Road and Juan Jacinto Road from May 11, 2026 to May 15, 2026. Contractor crews will be working at various locations along this area of Route 1 throughout the week and intermittent lane closures are expected during work hours:
- Monday to Friday, May 11 to May 15, 2026, 9:00 AM – 4:00 PM, (Route 1, between Wusstig Road and Juan Jacinto Road, install pavement markings and markers)
- Saturday, May 16, 2026, No Work Scheduled
- Sunday, May 17, 2026, No Work Scheduled
Route 17 Cross Island Road Improvements – Santa Rita/Yona
Motorists are advised of intermittent lane closures in both directions along Route 17 (Cross Island Road) between Route 5 and Route 4A as Samsung E&C America and their contractor continue pothole repairs and power pole installation. Work will occur between 7:00 AM and 3:30 PM Monday - Friday.
Motorists are advised of intermittent lane closures in both directions along Route 17 (Cross Island Road) between Route 5 and Route 4A as Samsung E&C America and their contractor continue pothole repairs and power pole installation. Work will occur between 7:00 AM and 3:30 PM Monday - Friday.
GUAM TRANSPORTATION PROGRAM
Telephone: (671) 646-3452
Fax: (671) 646-3449
Website: www.guamtransportationprogram.com