Road Safety Reminder for the Week
What to Do in Case of an Accident
(The Government of Guam requires that ALL vehicles be insured)
If you have an accident, you are required to:
- Stop and properly identify yourself to the other party. Leaving the scene of an accident where property damage has occurred is a MISDEMEANOR. If personal injury has resulted, it is a FELONY to leave the scene.
- If the property damage exceeds $100.00 or an injury has resulted, you should contact the police immediately, the law gives you a 24-hour period in which to report the accident.
- You are also required to report the accident within 10 working days from the time the police report has been completed to the Dept. of Revenue and Taxation if the damage exceeds $250.00 or someone has been injured.
According to Guam’s Traffic Violation Bureau’s (TVB) Traffic Fine Schedule
| GCA (Guam Code Annotated) Code | Description | Eff. 01/01/14 |
|---|---|---|
| 3501(A) | Leaving Scene with Injuries/Property Damage | $500.00 |
| 3502 | Failure to Report Accident | $500.00 |
| 19105 | Report of Accident Required – Insurance | $500.00 |
Guam Construction Update
Motorists are advised to drive cautiously through the construction zones, observe all posted speed limit and construction signs, and carefully heed flaggers (when present). Alternate routes and/or adjusting drive times when feasible are encouraged.
Islandwide Primary Roads Paving and Pavement Markings TO-4
Route 10 – Chalan Pago-Ordot/Mangilao/Barrigada
Construction activities will continue along Route 10 from June 1, 2026 to June 7, 2026. Contractor crews will be working at various locations along Route 10 throughout the week. Intermittent lane closures in both directions are expected during work hours:
Monday-Friday, June 1-5, 2026, 9:00 AM – 4:00 PM
Route 10 – Chalan Pago-Ordot/Mangilao/Barrigada
Construction activities will continue along Route 10 from June 1, 2026 to June 7, 2026. Contractor crews will be working at various locations along Route 10 throughout the week. Intermittent lane closures in both directions are expected during work hours:
Monday-Friday, June 1-5, 2026, 9:00 AM – 4:00 PM
- Pavement marking and striping at Route 10/Route 15 intersection
Saturday, June 6, 2026, 7:00 AM – 6:00 PM
- Pavement repair (milling and paving) at Route 10/Route 4 Intersection.
Sunday, June 7, 2026, No Work Scheduled. Work may be performed 7:00 AM – 6:00 PM if needed.
Motorists are advised to expect traffic delays and plan their travel time accordingly. Please use alternate routes and follow posted detour signs. Reduce speed and comply with posted limits when passing through the work zone. Remain alert for uneven pavement surfaces and temporary steel plates, and proceed with caution at all times.
Islandwide Safety Improvement on Primary Roads (Striping and Marking)
TO-03 - Route 1, from Route 27 to AAFB
Construction activities will begin along Route 1, from June 1, 2026 to June 5, 2026. Contractor crews will be working at various locations along this area of Route 1 throughout the week and intermittent lane closures are expected during work hours:
TO-03 - Route 1, from Route 27 to AAFB
Construction activities will begin along Route 1, from June 1, 2026 to June 5, 2026. Contractor crews will be working at various locations along this area of Route 1 throughout the week and intermittent lane closures are expected during work hours:
- Monday to Friday, June 1 to June 5, 2026, 9:00 AM – 4:00 PM, (between Route 27 and Juan Jacinto Road (Hafa Adai Market), install pavement markings and markers)
- Saturday, June 6, 2026, No Work Scheduled
- Sunday, June 7, 2026, No Work Scheduled
Route 17 Cross Island Road Improvements – Santa Rita/Yona
Motorists are advised of intermittent lane closures in both directions along Route 17 (Cross Island Road) between Route 5 and Route 4A as Samsung E&C America continues power pole installation. Work will occur between 7:00 AM and 3:30 PM Monday - Friday.
Motorists are advised of intermittent lane closures in both directions along Route 17 (Cross Island Road) between Route 5 and Route 4A as Samsung E&C America continues power pole installation. Work will occur between 7:00 AM and 3:30 PM Monday - Friday.
DPW HMC Grass Cutting: Route 17 (Cross Island Road) and Route 4 – Yona/Talofofo
The DPW HMC crew will be bush cutting and side cutting along Route 17 from Windward Hills to the Route 17/ Route 4 Intersection then along Route 4 heading south towards the Talofofo Bay Lookout. Work will occur between 9:00 AM and 3:00 PM. The DPW asks motorists to please proceed with caution and remain alert for traffic control signs and work crews.
The DPW HMC crew will be bush cutting and side cutting along Route 17 from Windward Hills to the Route 17/ Route 4 Intersection then along Route 4 heading south towards the Talofofo Bay Lookout. Work will occur between 9:00 AM and 3:00 PM. The DPW asks motorists to please proceed with caution and remain alert for traffic control signs and work crews.