Traffic Advisory for June 15-21, 2026

Traffic Advisory for June 15-21, 2026

ANNOUNCEMENT

Road Safety Reminder for the Week


Tire Blowout
If you have a tire blowout, do not panic or overreact. Suddenly braking or abruptly removing your foot from the accelerator can result in a loss of control over the vehicle. Instead, you should take the following steps recommended by the National Highway Traffic Safety Administration:

  • Hold the steering wheel with both hands.
  • Maintain your vehicle speed if possible and safe.
  • Gradually release the accelerator.
  • Correct the steering as necessary to stabilize your vehicle and regain control.
  • Look and steer in the direction you want your vehicle to go.
  • Once your vehicle has stabilized, continue to slow down and pull off the road where and when it’s safe.


Guam Construction Update

Motorists are advised to drive cautiously through the construction zones, observe all posted speed limit and construction signs, and carefully heed flaggers (when present). Alternate routes and/or adjusting drive times when feasible are encouraged.
 
Islandwide Primary Roads Paving and Pavement Markings TO-4
Route 10 – Chalan Pago-Ordot/Mangilao/Barrigada

Construction activities will continue along Route 10 from June 15, 2026 to June 20, 2026. Contractor crews will be working at various locations along Route 10 throughout the week. Intermittent lane closures in both directions are expected during work hours:

Monday-Friday, June 15-19, 2026, 9:00 AM – 4:00 PM
  • Striping work at Corten Torres/Route 10 intersection
  • Loop sensor installation at Route 15/ Route 10 intersection

Saturday, June 20, 2026, 7:00 AM – 6:00 PM
  • Pavement repair (milling and paving) at Route 10/Route 4 Intersection.

Sunday, June 21, 2026, No Work Scheduled. Work may be performed 7:00 AM – 6:00 PM if needed.

Motorists are advised to expect traffic delays and plan their travel time accordingly. Please use alternate routes and follow posted detour signs. Reduce speed and comply with posted limits when passing through the work zone. Remain alert for uneven pavement surfaces and temporary steel plates, and proceed with caution at all times.
 
Islandwide Safety Improvement on Primary Roads (Striping and Marking)
TO-03 - Route 1, from Route 27 to AAFB

Construction activities will begin along Route 1, from June 15, 2026 to June 19, 2026. Contractor crews will be working at various locations along this area of Route 1 throughout the week and intermittent lane closures are expected during work hours:
  • Monday to Friday, June 15 to June 19, 2026, 9:00 AM – 4:00 PM, (between Route 27 and Juan Jacinto Road (Hafa Adai Market), install pavement markings and markers)
  • Saturday, June 20, 2026, No Work Scheduled
  • Sunday, June 21, 2026, No Work Scheduled
 
Route 17 Cross Island Road Improvements – Santa Rita/Yona
Motorists are advised of intermittent lane closures in both directions along Route 17 (Cross Island Road) between Route 5 and Route 4A as Samsung E&C America continues power pole installation. Work will occur between 7:00 AM and 3:30 PM Monday - Friday.
 



 
GUAM TRANSPORTATION PROGRAM
Telephone: (671) 646-3452
Fax: (671) 646-3449

 
Notice Image
 


Share the Government of Guam’s PUBLIC NOTICES PORTAL


Share through Whatsapp, Facebook, Email and more…